Municipality of Siena (Italy)
On 27/02/2016 there were calamitous atmospheric events, caused by persistent and very intense downpours, which caused considerable damage to the entire road heritage of the Municipality of Siena. The most serious occurred along via Peruzzi, near a road embankment, where a significant collapse of a wall occurred with the consequent sliding of a large amount of land into the valley below.
Koysha Dam (Ethiopia)
The project has been commissioned by the Ethiopian Electric Power (EEP) and foresees the construction of a RCC dam, 170 m high, with a reservoir volume of 6000 million cubic meters. The hydroelectric plant will yearly produce 6,460 GWh.
Casanuova dam on the Chiascio river – Perugia (Italy)
The Valfabbrica dam on the Chiascio river, with its availability of 145 million cubic meters per year, is able to meet the drinking water needs of the city of Perugia and other smaller cities.
Riolunato Dam (Modena – Italy)
In 2015 Pizzi Instruments received the contract from the Gelmi Construction Company for the supply and installation of monitoring instrumentation for the Riolunato dam, currently managed by Enel Green Power.
Quaira della Miniera DAM (Bolzano – Italy)
In 2015 Pizzi Instruments receives from SE Hydropower of Bolzano the first contract for the supply of n. 3 laser telependulums – model LAC3000. In 2016, the customer, fully satisfied with the delivery, proceeded with the order of three additional laser telependulums – model LAC3000.
Column of Justice – Florence (Italy)
The Column of Justice is the highest and most beautiful columns of the city.