{"id":3324,"date":"2009-01-01T16:39:42","date_gmt":"2009-01-01T16:39:42","guid":{"rendered":"https:\/\/pizzi-instruments.it\/hpp-bumbuna-sierra-leone\/"},"modified":"2022-11-02T11:56:23","modified_gmt":"2022-11-02T11:56:23","slug":"hpp-bumbuna-sierra-leone","status":"publish","type":"projects","link":"https:\/\/pizzi-instruments.it\/en\/hpp-bumbuna-sierra-leone\/","title":{"rendered":"HPP Bumbuna Sierra Leone"},"content":{"rendered":"\n
Bumbuna hydroelectric plant: supply of monitoring instrumentation<\/p>\n\n\n\n
The Bumbuna hydroelectric power plant is located in Sierra Leone, about 350 km from the capital Freetown.<\/p>\n\n\n\n
The Bumbuna hydroelectric power plant project includes an 88 meter high cliff dam with an upstream face and a 50 MW hydroelectric power plant located on the Seli river.<\/p>\n\n\n\n
With its entry into service in 2009, there was a significant improvement in the problem related to the supply of electricity at a national level.<\/p>\n\n\n\n
Energy production takes place under the supervision and coordination of the National Power Authority.<\/p>\n\n\n\n
Pizzi Instruments carried out an initial supply of monitoring instrumentation during the construction phases of the project and, subsequently, during the management and maintenance phases of the plant.<\/p>\n\n\n\n
The supplies were concluded positively receiving positive feedback from the Client.<\/p>\n\n\n\n
DEC3000 Portable Datalogger<\/a><\/p>\n\n\n\n DEC5 Portable Readout Unit<\/a><\/p>\n\n\n\n Software di monitoraggio Sentinel<\/p>\n\n\n\n