{"id":3295,"date":"2012-01-01T09:47:35","date_gmt":"2012-01-01T09:47:35","guid":{"rendered":"https:\/\/pizzi-instruments.it\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/"},"modified":"2022-11-02T10:21:27","modified_gmt":"2022-11-02T10:21:27","slug":"g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia","status":"publish","type":"projects","link":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/","title":{"rendered":"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia : supply and commissioning of monitoring instrumentation<\/h2>\n\n\n\n<p>The project is situated at about 500 km north west of the Addis Abeba capital in the region of the Benishangul \u2013 Gumaz (Ethiopia), along the Blue Nile River.<\/p>\n\n\n\n<p>At the end of the works, the Grand Ethiopian Dam Renaissance Project will be the largest dam in Africa: 1.800 m long, 155 m high and with an overall volume of 74.000 million m\u00b3.<\/p>\n\n\n\n<p>The project foresees the construction of a main dam in Roller Compacted Concrete (RCC), with 2 Hydroelectric Power Plants installed at the foot of the dam.<\/p>\n\n\n\n<p>The project is completed by a 15,000 m3\/s capacity concrete spillway and a rockfill saddle dam 5 km long and 50 m high, both located on the left bank.<\/p>\n\n\n\n<p>Pizzi Instruments is currently providing for the supply and installation of monitoring equipment.<\/p>\n\n\n\n<p>The installed instrumentation was specially designed by Pizzi Instruments thanks to the long experience in geotechnical and structural monitoring, innovative solutions ensure reliable and long-lasting functionality over time.<\/p>\n\n\n\n<p>In agreement with the Customer, Pizzi Instruments has recently been asked to carry out an inspection directly in the dam, in order to estimate the needed monitoring equipment necessary to complete the works.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tools used:<\/h2>\n\n\n\n<p><a href=\"https:\/\/pizzi-instruments.it\/piezometro-corda-vibrante\/\">Piezometri corda vibrante<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/assestimetro-usbr\/\">Assestimetri USBR<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/sistema_di_misura_livello_piezometrico\/\">Piezometric Level Meter<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/sistema_di_misura_livello_ad_ultrasuoni\/\">Sistema di misura livello ultrasuoni<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/sistema_di_misura_livello_radar\/\">Sistema di misura livello radar<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/stramazzo\/\">Stramazzi<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/aste-idrometriche\/\">Aste idrometriche<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/pendolo_diritto_e_rovescio\/\">Pendoli rovesci<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/coordinometro-automatico-elettromeccanico\/\">Coordinometri automatici elettromagnetici<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/deformometro-3d-a-corda-vibrante\/\">Mechanical 3D Deformometer<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/datalogger_cum3000\/\">Datalogger CUM3000<br><\/a>Sentinel \u2013 Software di monitoraggio<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/GERDP-300x189-1.png\" alt=\"\" class=\"wp-image-1321\" width=\"381\" height=\"240\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The project is situated at about 500 km north west of the Addis Abeba capital in the region of the Benishangul \u2013 Gumaz (Ethiopia), along the Blue Nile River.<\/p>\n","protected":false},"author":2,"featured_media":2140,"menu_order":0,"template":"","meta":{"footnotes":""},"projects_tag":[],"projects_category":[46],"class_list":["post-3295","projects","type-projects","status-publish","has-post-thumbnail","hentry","projects_category-dams"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.8.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia - Pizzi Instruments<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia - Pizzi Instruments\" \/>\n<meta property=\"og:description\" content=\"The project is situated at about 500 km north west of the Addis Abeba capital in the region of the Benishangul \u2013 Gumaz (Ethiopia), along the Blue Nile River.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/\" \/>\n<meta property=\"og:site_name\" content=\"Pizzi Instruments\" \/>\n<meta property=\"article:modified_time\" content=\"2022-11-02T10:21:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"441\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/\",\"url\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/\",\"name\":\"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia - Pizzi Instruments\",\"isPartOf\":{\"@id\":\"https:\/\/pizzi-instruments.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png\",\"datePublished\":\"2012-01-01T09:47:35+00:00\",\"dateModified\":\"2022-11-02T10:21:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#primaryimage\",\"url\":\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png\",\"contentUrl\":\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png\",\"width\":700,\"height\":441},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pizzi-instruments.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/pizzi-instruments.it\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Monitoring Systems for Dams and Civil Engineering Projects\",\"item\":\"https:\/\/pizzi-instruments.it\/en\/projects-category\/dams\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pizzi-instruments.it\/#website\",\"url\":\"https:\/\/pizzi-instruments.it\/\",\"name\":\"Pizzi Instruments\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pizzi-instruments.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia - Pizzi Instruments","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/","og_locale":"en_US","og_type":"article","og_title":"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia - Pizzi Instruments","og_description":"The project is situated at about 500 km north west of the Addis Abeba capital in the region of the Benishangul \u2013 Gumaz (Ethiopia), along the Blue Nile River.","og_url":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/","og_site_name":"Pizzi Instruments","article_modified_time":"2022-11-02T10:21:27+00:00","og_image":[{"width":700,"height":441,"url":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/","url":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/","name":"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia - Pizzi Instruments","isPartOf":{"@id":"https:\/\/pizzi-instruments.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#primaryimage"},"image":{"@id":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#primaryimage"},"thumbnailUrl":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png","datePublished":"2012-01-01T09:47:35+00:00","dateModified":"2022-11-02T10:21:27+00:00","breadcrumb":{"@id":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#primaryimage","url":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png","contentUrl":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2012\/01\/GERDP_Sito.png","width":700,"height":441},{"@type":"BreadcrumbList","@id":"https:\/\/pizzi-instruments.it\/en\/g-e-r-d-p-grand-ethiopian-renaissance-dam-project-ethiopia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pizzi-instruments.it\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/pizzi-instruments.it\/projects\/"},{"@type":"ListItem","position":3,"name":"Monitoring Systems for Dams and Civil Engineering Projects","item":"https:\/\/pizzi-instruments.it\/en\/projects-category\/dams\/"},{"@type":"ListItem","position":4,"name":"G.E.R.D.P. (Grand Ethiopian Renaissance Dam Project) Ethiopia"}]},{"@type":"WebSite","@id":"https:\/\/pizzi-instruments.it\/#website","url":"https:\/\/pizzi-instruments.it\/","name":"Pizzi Instruments","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pizzi-instruments.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects\/3295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":3,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects\/3295\/revisions"}],"predecessor-version":[{"id":3298,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects\/3295\/revisions\/3298"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/media\/2140"}],"wp:attachment":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/media?parent=3295"}],"wp:term":[{"taxonomy":"projects_tag","embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects_tag?post=3295"},{"taxonomy":"projects_category","embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects_category?post=3295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}