{"id":3155,"date":"2018-01-01T16:42:36","date_gmt":"2018-01-01T16:42:36","guid":{"rendered":"https:\/\/pizzi-instruments.it\/fiastra-dam-macerata-italy\/"},"modified":"2022-10-27T07:03:05","modified_gmt":"2022-10-27T07:03:05","slug":"fiastra-dam-macerata-italy","status":"publish","type":"projects","link":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/","title":{"rendered":"Fiastra Dam (Macerata \u2013 Italy)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Fiastra Dam (Macerata \u2013 Italy): supply of monitoring instrumentation<\/h2>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p>The lake of Fiastra is the largest hydroelectric reservoir in the region of Marche and was built in 1954.<br>Today the lake carries out, besides its hydroelectric function, an important tourist role thanks to its position between mountains and woods.<br>The lake water, fed by the Fiastrone River, is conducted by means of derivation works in the Valcimarra power plant where it is swirled and released into the Borgiano Basin.<br>These works allow the connection between the Fiastrone and Chienti sides.<\/p>\n\n\n\n<p>The Fiastrone tank has a total capacity of 20 million cubic meters and a useful capacity for production of 16 million cubic meters.<br>The barrier is of symmetrical gravity arc type in reinforced concrete; the height of the crowning varies according to the riverbed from 82 to 87 m and its development is equal to 254m.<br>Its altitude is 650 meters above sea level .<\/p>\n\n\n\n<p>In June 2018 Pizzi Instruments signed an important \u201cframework agreement\u201d, with a three-year duration, for the supply and installation of monitoring equipment for the dams managed by Enel Green Power SpA.<br>With reference to the framework contract signed, Pizzi Instruments receives the order for the supply of monitoring equipment for the Fiastra dam; <a href=\"https:\/\/pizzi-instruments.it\/coordinometro_automatico_laser\/\">the supply includes among its most important instruments as the automatic laser coordinometer LAC 3000,<\/a> together with the direct and inverted pendulums, <a href=\"https:\/\/pizzi-instruments.it\/pendolo_diritto_e_rovescio\/\">which are really important instruments for the monitoring and control of translations and rotations<\/a> in large structures as the dams are.<br>The supply was successfully completed, obtaining the certificate of regular execution of the works.<\/p>\n\n\n\n<p><strong>Instruments<br><\/strong><a href=\"https:\/\/pizzi-instruments.it\/category\/prodotti\/pendoli-e-coordinometri\/\">Direct and Inverted Pendulum<\/a><br><a href=\"https:\/\/pizzi-instruments.it\/coordinometro_automatico_laser\/\">Laser telependulum <\/a><br><a href=\"https:\/\/pizzi-instruments.it\/egs-coordinometro-portatile\/\">EGS Portable <\/a><\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>In June 2018 Pizzi Instruments signed an important \u201cframework agreement\u201d, with a three-year duration, for the supply and installation of monitoring equipment for the dams managed by Enel Green Power SpA.<\/p>\n","protected":false},"author":2,"featured_media":1800,"menu_order":2,"template":"","meta":{"footnotes":""},"projects_tag":[],"projects_category":[46],"class_list":["post-3155","projects","type-projects","status-publish","has-post-thumbnail","hentry","projects_category-dams"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.8.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Fiastra Dam (Macerata \u2013 Italy) - Pizzi Instruments<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fiastra Dam (Macerata \u2013 Italy) - Pizzi Instruments\" \/>\n<meta property=\"og:description\" content=\"In June 2018 Pizzi Instruments signed an important \u201cframework agreement\u201d, with a three-year duration, for the supply and installation of monitoring equipment for the dams managed by Enel Green Power SpA.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/\" \/>\n<meta property=\"og:site_name\" content=\"Pizzi Instruments\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-27T07:03:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"770\" \/>\n\t<meta property=\"og:image:height\" content=\"441\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/\",\"url\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/\",\"name\":\"Fiastra Dam (Macerata \u2013 Italy) - Pizzi Instruments\",\"isPartOf\":{\"@id\":\"https:\/\/pizzi-instruments.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg\",\"datePublished\":\"2018-01-01T16:42:36+00:00\",\"dateModified\":\"2022-10-27T07:03:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#primaryimage\",\"url\":\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg\",\"contentUrl\":\"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg\",\"width\":770,\"height\":441},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pizzi-instruments.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/pizzi-instruments.it\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Monitoring Systems for Dams and Civil Engineering Projects\",\"item\":\"https:\/\/pizzi-instruments.it\/en\/projects-category\/dams\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Fiastra Dam (Macerata \u2013 Italy)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pizzi-instruments.it\/#website\",\"url\":\"https:\/\/pizzi-instruments.it\/\",\"name\":\"Pizzi Instruments\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pizzi-instruments.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Fiastra Dam (Macerata \u2013 Italy) - Pizzi Instruments","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/","og_locale":"en_US","og_type":"article","og_title":"Fiastra Dam (Macerata \u2013 Italy) - Pizzi Instruments","og_description":"In June 2018 Pizzi Instruments signed an important \u201cframework agreement\u201d, with a three-year duration, for the supply and installation of monitoring equipment for the dams managed by Enel Green Power SpA.","og_url":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/","og_site_name":"Pizzi Instruments","article_modified_time":"2022-10-27T07:03:05+00:00","og_image":[{"width":770,"height":441,"url":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/","url":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/","name":"Fiastra Dam (Macerata \u2013 Italy) - Pizzi Instruments","isPartOf":{"@id":"https:\/\/pizzi-instruments.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#primaryimage"},"image":{"@id":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#primaryimage"},"thumbnailUrl":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg","datePublished":"2018-01-01T16:42:36+00:00","dateModified":"2022-10-27T07:03:05+00:00","breadcrumb":{"@id":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#primaryimage","url":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg","contentUrl":"https:\/\/pizzi-instruments.it\/wp-content\/uploads\/2022\/09\/Diga-Fiastra.1.jpg","width":770,"height":441},{"@type":"BreadcrumbList","@id":"https:\/\/pizzi-instruments.it\/en\/fiastra-dam-macerata-italy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pizzi-instruments.it\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/pizzi-instruments.it\/projects\/"},{"@type":"ListItem","position":3,"name":"Monitoring Systems for Dams and Civil Engineering Projects","item":"https:\/\/pizzi-instruments.it\/en\/projects-category\/dams\/"},{"@type":"ListItem","position":4,"name":"Fiastra Dam (Macerata \u2013 Italy)"}]},{"@type":"WebSite","@id":"https:\/\/pizzi-instruments.it\/#website","url":"https:\/\/pizzi-instruments.it\/","name":"Pizzi Instruments","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pizzi-instruments.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects\/3155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":4,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects\/3155\/revisions"}],"predecessor-version":[{"id":3160,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects\/3155\/revisions\/3160"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/media\/1800"}],"wp:attachment":[{"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/media?parent=3155"}],"wp:term":[{"taxonomy":"projects_tag","embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects_tag?post=3155"},{"taxonomy":"projects_category","embeddable":true,"href":"https:\/\/pizzi-instruments.it\/en\/wp-json\/wp\/v2\/projects_category?post=3155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}