{"id":5396,"date":"2023-11-22T14:35:00","date_gmt":"2023-11-22T14:35:00","guid":{"rendered":"https:\/\/pizzi-instruments.it\/?p=5396"},"modified":"2023-11-23T11:53:21","modified_gmt":"2023-11-23T11:53:21","slug":"october-2023-we-completed-the-works-at-the-cathedral-of-pienza-siena-for-the-installation-of-a-new-seismic-monitoring-system","status":"publish","type":"post","link":"https:\/\/pizzi-instruments.it\/en\/october-2023-we-completed-the-works-at-the-cathedral-of-pienza-siena-for-the-installation-of-a-new-seismic-monitoring-system\/","title":{"rendered":"October 2023: We completed the works at the cathedral of Pienza (Siena) for the installation of a new seismic monitoring system."},"content":{"rendered":"\n
At the end of October we completed the installation of a seismic monitoring system at the Pienza (Siena) cathedral. This project makes part of the maintenance contract subscribed between the Swiss company GeoSIG and the Seismic Department of the Civil Protection of Rome<\/p>\n\n\n\n
The installed system consists of:<\/p>\n\n\n\n
n. 01 base unit that works as a ground sensor<\/p>\n\n\n\n
n. 04 sensors at the corners of the building terrace<\/p>\n\n\n\n
The intervention of rope rescue operators was necessary to carry out the work.<\/p>\n\n\n\n